| No |
Project |
Status |
|
Development of Operator and Training Simulator for Turkmenistan Block 1 Gas Development |
|
2 |
Corrosion Management Plan (CMP) for Turkmenistan Block 1 Gas Development |
On-going |
3 |
Implementation of Structural Integrity Management System for PCSB Operation |
On-going |
4 |
Provision of Load Resistance Factor Design (LRFD) for PCSB |
On-going |
5 |
PVT Analysis for Banda Field, Mauritania |
On-going |
6 |
Study on the Effectiveness of NaOH in Controlling Internal Corrosion for the MCR-A-GBS Structure for PCSB Turkmenistan |
On-going |
7 |
Health Safety and Environment Case Development, CPOC |
On-going |
8 |
QRA & ERP for the Construction, Commissioning and Operating of a New 410,000 bbls NGL Tank at BCOT |
On-going |
9 |
Failure Investigation for Corroded Tubing of F-94 Well in Samarang Field, PCSB-SBO |
On-going |
10 |
Provision for OLGA modelling support for Chinguetti Phase II, PC Mauritania |
On-going |
11 |
Development of Reliability, Availability and Maintainability (RAM) Model for D35 Field, PCSB-SKO |
On-going |
12 |
Perform sensitivity study on impact of marine growth for PCSB (Domestic Operation) |
On-going |
13 |
Update of PTS documents in Accordance with the Latest API 5L and ISO Standards, PCSB |
On-going |
14 |
Environmental Impact Assessment (EIA) for PETRONAS Carigali Sdn Bhd, J4 Field |
On-going |
15 |
Environmental Impact Assessment (EIA) for Kebabangan Petroleum Oil Company, KPOC |
On-going |
16 |
Establish A Standalone PTS for Structural Integrity Management (SIM), PCSB |
On-going |
17 |
Maintenance Reference Plan for Angsi, Duyong and Dulang Platforms for PCSB-PMO |
Completed |
18 |
Provision for OLGA modelling support for Chinguetti Phase 1, PC MAURITANIA |
Completed |
19 |
Subsea Reliability & Integrity Management System (PCSB) |
Completed |
20 |
Structural Integrity Management System (SIMS) for PCSB Operations
(9 platforms) |
Completed |
21 |
EPCC of Leak Detection System for Underground Fuel Hydrant at KLIA Aviation Fuel Terminal, (PDB) |
Completed |
22 |
Operator Training Simulator for Khursaniyah Gas Plant For Saudi Aramco |
Completed |
23 |
Data Management for Risk Based Inspection, 9 Platforms at Baronia & Baram Area for PCSB-SKO |
Completed |
24 |
Training and Consultancy Led Badleys Traptester (Seismic Data Interpretation) for Sarawak Shell Berhad |
Completed |
25 |
Data Management for Risk Based Inspection, 29 Platforms at Baram South for PCSB-SKO |
Completed |