| No |
Project |
|
|
Development of Operator and Training Simulator for Turkmenistan Block 1 Gas Development |
|
2 |
Corrosion Management Plan (CMP) for Turkmenistan Block 1 Gas Development |
|
3 |
Implementation of Structural Integrity Management System for PCSB Operation |
|
4 |
Provision of Load Resistance Factor Design (LRFD) for PCSB |
|
5 |
PVT Analysis for Banda Field, Mauritania |
|
6 |
Study on the Effectiveness of BaCl2 in Controlling Internal Corrosion for the MCR-A-GBS Structure for PCSB Turkmenistan |
|
7 |
Health Safety and Environment Case Development, CPOC |
|
8 |
EIA & ERP for the Construction, Commissioning and Operating of a New 410,000 bbls NGL Tank at BCOT |
|
9 |
Failure Investigation for Corroded Tubing of F-94 Well in Samarang Field, PCSB-SBO |
|
10 |
Provision for OLGA modelling support for Chinguetti Phase II, PC Mauritania |
|
11 |
Development of Reliability, Availability and Maintainability (RAM) Model for D35 Field, PCSB-SKO |
|
12 |
Perform sensitivity study on impact of marine growth for PCSB (Domestic Operation) |
|
13 |
Update of PTS documents in Accordance with the Latest API 5L and ISO Standards, PCSB |
|
14 |
Environmental Monitoring Report for PETRONAS Carigali Sdn Bhd, J4 Field |
|
15 |
Environmental Impact Assessment (EIA) for Kebabangan Petroleum Oil Company, KPOC |
|
16 |
Establish A Standalone PTS for Structural Integrity Management (SIM), PCSB |
|
17 |
Maintenance Reference Plan for Angsi, Duyong and Dulang Platforms for PCSB-PMO |
|
18 |
Provision for OLGA modelling support for Chinguetti Phase 1, PC MAURITANIA |
|
19 |
Subsea Reliability & Integrity Management System (PCSB) |
|
20 |
Structural Integrity Management System (SIMS) for PCSB Operations (9 platforms) |
|
21 |
EPCC of Leak Detection System for Underground Fuel Hydrant at KLIA Aviation Fuel Terminal, (PDB) |
|
22 |
Operator Training Simulator for Khursaniyah Gas Plant For Saudi Aramco |
|
23 |
Data Management for Risk Based Inspection, 9 Platforms at Baronia & Baram Area for PCSB-SKO |
|
24 |
Training and Consultancy Led Badleys Traptester (Seismic Data Interpretation) for Sarawak Shell Berhad |
|
25 |
Data Management for Risk Based Inspection, 29 Platforms at Baram South for PCSB-SKO |
|
26 |
Sabah Sarawak Gas Pipemill Assessment |
|
27 |
Development of Operating Procedure Manuals for Offshore and Onshore Operations for Turkmenistan Block 1 Gas Development Project |
|
28 |
Provision for Developing the HSE Case for Turkmenistan Onshore and Offshore Facilities |
|
29 |
Provision for Corrosion Management Plan for 20 Pipelines of PCSB-PMO |
|
30 |
Environmental Management Plan for 2009 Samarang Pipeline Replacement and Redevelopment Project |
|
31 |
Environmental Monitoring Report (EMR) for Bokor Phase - 2 Redevelopment Project |
|
32 |
Seismic Criteria Sensitivity Study for PCSB (Domestic Operation) |
|
33 |
Environmental Management Plan for SKO Pipeline PL339 Replacement Project |
|
34 |
BaCl2 Study Implementation and Installation for MCR-A GBS Internal Corrosion Mitigation |
|
35 |
Operating Procedure Manual (OPM) and HSE Case Manual for MCR-A/MDP-A and OGT for PC(T)SB |
|
36 |
Flow Assurance & Corrosion-Erosion Study for Kinarut & Semarang Kechil Platform for PCSB-SBO |
|
37 |
Cathodic Protection Design and Calculation for GBS Internal Surfaces for PC(T)SB |
|
38 |
Seismic/Earthquake Studies for Very High and High Risk PMO, SKO & SBO Facilities for PCSB |
|
39 |
Corrosion Management Plan (CMP) for Dulang Field (CGCE) Project for PCSB-PMO |
|
40 |
HVAC Assessment & Spare Management for TKQ-A, BNQ-A, D35Q-A Platfroms for PCSB-SKO |
|
41 |
Chinguetti Hydraullic Study Phase II for PCSB |
|
42 |
Enviromental Management Plan (EMP) for BARDEGG 2 for PCSB |